Everyone related to the construction process has incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment to the contractors and designers who want to do their job well and move on to the next project. Lean Construction is based on the holistic pursuit of continuous improvements aimed at minimizing costs and maximizing value on a construction project: planning, design, construction, activation, operations, maintenance, salvaging, and recycling.

To help contractors develop the knowledge needed to build lean, the Associated General Contractors of America developed the Lean Construction Education Program. Construction professionals at all experience levels, will learn the building blocks necessary to transform their projects and companies into a lean operating system.

Variation in Production Systems
May 8, 2014| 7:30am-12:00 noon

  • Define the different types of variation
  • Explain the concept of throughput
  • Distinguish the concepts of throughput and work in progress
  • Describe the role of variation in production operations
  • List sources of variation in construction settings
  • Explain variation mitigation techniques
  • Contrast variation mitigation techniques

Pull in Production
May 8, 2014 |12:30pm-5:00pm

  • Compare batch andqueue and continuous flow production systems
  • Distinguish push systems from pull systems
  • Describe the impact of pull on production systems
  • Explain pull strategies in construction operations

Lean Workstructuring
May 9, 2014 | 7:30am-12:00 noon

  • Apply the methods and tools utilized in pull planning
  • Describe the concept of Lean Workstructuring
  • Outline the desired products of Lean Workstructuring
  • Describe thecharacteristics and application of the Last Planner® System

The Last Planner® System
May 9, 2014 | 12:30pm-5:00pm

  • Apply the Last Planner®System on a project
  • Hold make-ready and weekly work planning sessions
  • Calculate, track and analyze percent plan complete for a project