Marines 3D-Print Concrete Footbridge in Field
Post date
February 18, 2019
Body
By Kim Slowey, Construction Dive
Marines from the 1st Marine Logistics Group at Camp Pendleton in California have completed construction of a usable, 3D-printed concrete footbridge as part of a field exercise. This was the first time in the Western Hemisphere that a bridge was 3D-printed onsite rather than in a controlled environment like a factory.